First Fix

First fix carpentry is the initial stage of carpentry work in construction, focusing on the structural elements of a building. During the first fix phase, we work on the basic framework and internal structure before the plastering and finishing touches are applied. Here are the key tasks involved in first fix carpentry

key tasks involved in first fix carpentry

Stud Walls

we construct stud walls, which form the basic framework of the building. These walls provide support for the structure and divide the space into rooms.

Floor Joists

we install floor joists, which are horizontal beams that support the flooring materials. Joists are a crucial part of the building's structure, providing stability and strength to the floors.

Roof Structures

we work on roof structures, including installing roof trusses or rafters. These components form the foundation of the roof, supporting the roof covering materials and ensuring the roof's structural integrity.

Door and Window Frames

we fit door frames and window frames in the openings created in the stud walls. These frames provide support for doors and windows, allowing them to be properly installed later during the second fix phase

Stairs

If the building has multiple levels, we may construct the basic framework for stairs during the first fix stage. This includes installing stringers (the inclined components that support the steps) and risers (the vertical components between steps).

Services Installation

we create channels and frames to accommodate electrical wiring, plumbing pipes, and other services within the walls and floors. These channels allow for the installation of utilities without compromising the structural integrity of the building.

First fix we forms the foundation upon which the rest of the building process relies. It is crucial for as to be precise and accurate during this stage, as any mistakes or inaccuracies can affect the entire structure of the building. Once the first fix carpentry is complete, the construction can progress to the second fix stage, where the focus shifts to finishing details and aesthetic elements.

Second Fix

Second fix work that comes after the first fix phase. During this stage, the focus shifts from structural elements to the finer details and finishing touches inside the building. Second fix we adds the aesthetic and functional elements that make the interior of the building complete and ready for occupancy. Here are the key tasks involved in second fix we do

key tasks involved in Second fix carpentry

Skirting Boards

we install skirting boards at the base of walls. Skirting boards serve both functional and decorative purposes, covering the joint between the wall and the floor while also adding a visual finishing touch.

Architraves

Architraves are decorative moldings that surround doorways, windows, or other openings. we fit architraves to provide a polished appearance around doors and windows.

Doors

we hang doors on the previously installed door frames. This includes fitting hinges, handles, and locks. Doors can be internal (inside the building) or external (leading to the outside).

Window Sills and Trim

we install window sills, also known as window ledges, at the bottom of windows. They may also add decorative trim around windows to enhance their appearance.

Stairs

If the building has multiple levels, we may construct the basic framework for stairs during the first fix stage. This includes installing stringers (the inclined components that support the steps) and risers (the vertical components between steps).

Built-In Furniture

we create and install built-in furniture such as bookshelves, cabinets, wardrobes, and other storage solutions. These items are customized to fit specific spaces and enhance the functionality of rooms.

Flooring

While flooring itself is not always considered carpentry, the installation of wooden floors or similar materials often falls under the expertise of carpenters during the second fix phase.

Staircase Finishing

If a staircase was constructed during the first fix phase, second fix we involves adding balustrades, handrails, and any decorative elements to complete the staircase.

Final Touches

This includes various final touches, such as fitting doorstops, installing curtain rods, and ensuring all elements are properly aligned and functioning.

Second fix requires a high level of precision and attention to detail, as the quality of work in this stage significantly contributes to the overall appearance and functionality of the interior spaces. we working in the second fix phase often collaborate closely with other tradespeople, such as painters and decorators, to ensure a seamless and visually appealing final result.